We – EPG Team the greatest worm gearbox, couplings and gears factory in China with 5 diverse branches. For far more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828 /
Product Description
A: Description
The cylinders and the screw stems of the previously mentioned extruders are manufactured of substantial-high quality alloy steel with optimum hardness and powerful corrosion resistance following revision finishing and nitrogen treatment. The auxiliary machine has a platform wor ept desk for ma ept peration simple. The coiling unit adopts torque motor to maintain proper rigidity and make rolling even and roll-modifying straightforward.
B. Use:
It is used for blowing the numerous plastic film of reduced density polyethylene(LDPE), high density polyethylene (HDPE) and linear lower density polyethylene(LLDPE) and so forth, Which are broadly employed for pac ept industrial merchandise, textile, garments and meals and for cohering farmland.
C.Technology Parameter
Model | FB-MN600 | FB-MN800 | FB-MN500 |
Screw Diameter | 50mm | 55mm | 45mm |
Screw Ratio | L/D28:one | L/D28:1 | L/D28:one |
Screw Speed | ten-100r/min | ten-100r/min | ten-100r/min |
Power of Principal Motor | 11KW | 15KW | seven.5KW |
Max. Extrude Output | 35kg/h | 50kg/h | 25kg/h |
Max. Folding Width of Movie | 600mm | 800mm | 500mm |
Solitary-sided Thickness of Movie | .006 -.10mm | .006 -.10mm | .006 -.10mm |
Whole Power | 18Kw | 22Kw | 15Kw |
Weight of Equipment | 2000kg | 2200kg | 1800kg |
All round Dimensions(L×W×H) | 1500×1800× 2200mm | 1500×2000× 2200mm | 1500×1600× 2200mm |
D: Details Information
1. Extruder Unit
Die Head Content: Cr40 Mould Metal
Die Head Heating: Steel Stainless
Rotary Die Head: Optional
Screw and Barrel Material: 38CrMoALA
Screw and Barrel Heating:3Zones
Heating Ring Content: Steel Stainless
Display Changer: Handbook Kind
Gear Box: Tough Tooth Surface area Equipment Box
2. Just take Up Section
‘A’ Condition Film Forming Plate: Picket Bar Type
Film Bubble Placing Ring: Picket Bar Kind
Take Up Motor:3-Section Asynchronous Motor with Worm Equipment Reducer
Take Up Rollers Grasp: Air Cylinder
3. Winder Unit
Rewinder Variety: Friction Sort
Rewinding Station: One Stations
Rewinding Motor: Torque Motor
Pinch Roller: Steel Roller
E. Following provider of XIHU (WEST LAKE) DIS.
1. How prolonged will your engineer reach to our manufacturing facility?
In a single 7 days following device arrival at your manufacturing unit.
2. How numerous times will you finish setting up?
We will end set up and training inside of 15days.
3. What should we charge for your engineer?
You should cost for the price of our engineer’s visa, air tickets, lodge, foods, and also their salary 80USD per day for every individual.
four. How long of your machine’s guarantee time period?
All our machines have a single 12 months guarantee after finishing installation.
5. How could we do soon after one particular calendar year guarantee period?
We also can offer you our very best after service, of course you will afford our technician’s expense.
6. Can you find us any engineer in our location?
Of course, we will check and advise you as shortly as achievable.
F. XIHU (WEST LAKE) DIS. Workshop
Welcome to speak to with me freely any question.
/ The use of original gear manufacturer’s (OEM) element quantities or trademarks , e.g. CASE® and John Deere® are for reference purposes only and for indicating product use and compatibility. Our company and the detailed substitution areas contained herein are not sponsored, accepted, or made by the OEM. /