
With EPG brand registered in more than 70 countries like America , Europe , Japan and so on, it has partners among world top enterprises, such as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, etc.
Overview
Quick Details
- After Warranty Service:
-
Video technical support
Adding a second engine simply is not practical, which makes power take off (PTO) a valuable element in providing power to secondary functions. To recognize their value requires a better understanding of these systems, their various types, and their various applications.
- Local Service Location:
-
Egypt
- Showroom Location:
-
Egypt
- Type:
-
partsThe computer then compares the output subassembly stack height to the distance between the housing bearing seats and calculates the shim pack required for the desired bearing endplay. Using the worm-gear centerline measurement, it shows assemblers how to distribute shims between the front and rear bearings to precisely center the gear in the housing. Measurement accuracy is ±0.001 in. Total cycle time, excluding loading and unloading, is less than 20 sec.
- After-sales Service Provided:
-
Video technical support
Supply Ability
- Supply Ability:
- 30000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details
- Carton or Plywood case or PALLET
- Port
- NINGBO / SHANGHAI CHINA
Online Customization
construction machinery hydraulic steering control unit for sale , steering units

![]()




BHR1,BHR2,BHR3 Hydraulic steering units are similar wiThe company was certified by ISO9001:2008 Quality Management System.th BZZ series, widely applied to low speed and heavy load vehicles,like construction machinery, folklift ,tractor, harvester and helm control etc.



![]()
| Type |
Displacement (ml/r) |
Rated Flow (l/min) |
Max input pressure (Mpa) |
Max cont back pressure(Mpa) |
Normal Input Torque |
| BHR1,2,3-80 | 80 | 8 | 17.5 | 2.5 | <2.5 |
| BHR1,2,3-100 | 100 | 10 | 17.5 | 2.5 | <2.5 |
| BHR1,2,3-125 | 125 | 13 | 17.5 | 2.5 | <2.5 |
| BHR1,2,3-160 | 160 | 16 | 17.5 | 2.5 | <2.5 |
| BHR1,2,3-200 | 200 | 20 | 17.5 | 2.5 | <3 |
| BHR1,2,3-250 | 250 | 25 | 17.5 | 2.5 | <3 |
| BHR1,2,3-280 | 280 | 28 | 17.5 | 2.5 | <3 |
| BHR1,2,3-315 | 315 | 32 | 17.5 | 2.5 | <3 |
| BHR1,2,3-400 | 400 | 40 | 17.5 | 2.5 | <3 |
| BHR1,2,3-500 | 500 | 50 | 17.5 | 2.5 | <3 |
| BHR1,2,3-630 | 630 | 60 | 17.5 | 2.5 | <3 |
| BHR1,2,3-800 | 800 | 75 | 17.5 | 2.5 | <3 |
| BHR1,2,3-1000 | 1000 | 75 | 17.5 | 2.5 | <3 |
More Products


Packaging & Shipping
| OEM | yes |
| Lead Time | 5-20 working days for less than 1500pcs |
| Payment | L/C,T/T |
| 30% advance payment,the balance paid before shipment | |
| Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
| Shipping | 1)By air or sea or combined transportation |
| 2)Express:TNT,FEDEX,UPS,DHL |


Company Information








Our Services






